Underfloor pipe work:-


These are the heat plates that are installed under wooden floors.







Pipe work installed clipped to insulation on solid floors.



Pipework to different rooms.



Pipe work different rooms.





This is the pipework being stapled to the insulation and the places left out for the fitted units.



This is the pipework to connect to the manifold.



This is the manifold with underfloor pipework connected.



This space is left out ready for the new stairs.







The blue strip around the edges is for the expansion of the concrete floor.



Manifold with pump and wired.



With flow and return pipe connected to the Heatpump.


Under floor to house in Shrewley.


Manifold installation heated by oil boiler.


Overlay system installed on top of existing floor ready for timber or tiles.


Floor ready for tiling.


New kitchen floor.


This is the manifold for the overlay system.